{"resourceId":"goyang-ai-signals-deogeun-pilot-after-hwajeong-7-6-percent-delay-cut-2026-11","versions":[{"version":"external-b8a1d275b9fb8c7b420f0dd9d37421dfc0b839aacccc38ef619653902feb1282","resource":{"id":"goyang-ai-signals-deogeun-pilot-after-hwajeong-7-6-percent-delay-cut-2026-11","title":"Goyang, South Korea, expands real-time AI signal control to five Deogeun intersections from Nov. 23 after reporting a 7.6% morning-peak delay cut on Hwajeong-ro","organization":"Goyang City; Goyang Police Station","sector":"Municipal traffic signal management","geography":"Goyang, Gyeonggi Province, South Korea","publishedAt":"2026-11-09","publicationDate":"2026-11-09","eventDate":"2026-11-23","sourceName":"Metro Seoul (메트로신문)","sourceLabel":"Korean newspaper report on a city announcement","sourceUrl":"https://www.metroseoul.co.kr/article/20261109500181","evidenceClass":"independent-reporting","outcomeClass":"effective","topics":["infrastructure","operating-model"],"finding":"Goyang will pilot a real-time AI signal system at five Deogeun district intersections from Nov. 23 to Dec. 20, 2026, using intersection CCTV volume counts to reallocate green time automatically. On seven Hwajeong-ro intersections, where the system moved from pilot to regular operation with the local police, the city reports adjustments of 4 to 26 seconds per intersection and a 7.6 percent average reduction in morning-peak intersection delay before versus after.","sledRelevance":"Offers a city-reported before/after delay figure for AI adaptive signals and a pilot-to-operation path with police (who control signals in Korea). U.S. transferability is limited by different signal ownership and detection infrastructure.","evidence":"City-reported before/after analysis; no method, sample period or control corridor described.","architectureImplications":"Reuses existing smart-intersection CCTV for directional volume detection feeding the signal controller.","governanceImplications":"Joint city-police operation; pilot results gated expansion.","securityPrivacyImplications":"CCTV used for counts; privacy handling not described.","caveats":"Published Nov. 9, before the last run; included because the new pilot starts Nov. 23 and the source is not in the archive. Single city announcement; no methodology.","streamIds":["transportation"],"roles":{"sales":"Framing point: a modest, city-reported 7.6 percent delay cut is a realistic benchmark, not a headline. Useful with city traffic engineers considering AI adaptive control on existing camera corridors. The figure lacks method and is non-U.S., so it supports a pilot-and-measure proposal, not a guaranteed result.","engineering":"Framing point: camera-based volume detection drives green-time reallocation. Fit depends on directional detection quality and controller integration. Constraints include pedestrian timing minimums and U.S. controller standards. Proof of value should replicate a before/after delay study with a control corridor and record pedestrian effects.","delivery":"Framing point: corridor-by-corridor rollout with an evaluation gate. Work would set the baseline period, evaluation method and expansion criteria, with signal operations as owner. Acceptance criteria below are proposals; Goyang's figure is its own reported result."},"roleDetails":{"sales":{"customerProblem":"Fixed signal timing does not track shifting directional demand, causing peak delay.","stakeholders":["City traffic engineering","Signal operations","Police traffic unit","Transit operator"],"discoveryQuestions":["Do your intersections already have cameras that count by direction?","How do you measure delay before and after timing changes?","Who must approve automated timing changes?"],"valueHypothesis":"AI timing could cut peak delay by single-digit percentages on suitable corridors.","potentialEngagement":"A bounded corridor pilot with a pre-agreed evaluation method.","unsupportedClaims":["A 7.6 percent result in a U.S. city","Safety improvements","Cost savings"]},"engineering":{"fit":"Adaptive control using existing CCTV detection.","architectureIntegration":"Camera volume counts into a timing engine that writes to signal controllers.","prerequisites":["Directional detection","Controller interface","Baseline data"],"constraints":["Pedestrian minimum timing","Controller standards differ from Korea","No method published"],"security":"Controller write access needs authentication and network segmentation.","proofOfValue":["Before/after delay with a control corridor","Pedestrian wait time tracking"]},"delivery":{"work":"Run a pilot corridor with an evaluation gate before expansion.","dependencies":["Detection hardware","Controller integration","Data collection"],"ownership":"City signal operations.","skillsAdoption":"Signal engineers need to monitor and override AI timing.","governanceCheckpoints":["Baseline approval","Mid-pilot review","Expansion decision"],"acceptanceCriteria":["Proposed: measurable peak delay reduction versus control","Proposed: no increase in pedestrian wait beyond limits"],"risks":["Detection errors","Unmeasured side-street delay","Overstated benefits"]}},"retrievedAt":"2026-11-18T22:17:14-06:00","enrichedAt":"2026-11-18T22:20:28-06:00","enrichmentBasis":"retrieved source","accessibilityWorkforceImplications":"Not addressed; pedestrian crossing time effects were not reported.","procurementImplications":"Vendor and cost not reported.","operatingModelImplications":"Pilot, evaluate, then expand corridor by corridor.","sourceVerification":{"openedUrl":"https://www.metroseoul.co.kr/article/20261109500181","referenceExcerpt":"고양시가 시스템 도입 전후 교통상황을 분석한 결과 오전 출근시간대 교차로 지체도는 평균 7.6% 감소한 것으로 나타났다.","promptVersion":"sled-research-v4.0","model":null,"basis":"agent-reported inspection"}}}]}