{"resourceId":"neuhofen-water-cooperative-digital-twin-pv-pump-scheduling-backtest-2026","versions":[{"version":"external-55d15e90678e1c3fef2dac99e630cab986dd5e9ea9c452ee087900c95de49ac9","resource":{"id":"neuhofen-water-cooperative-digital-twin-pv-pump-scheduling-backtest-2026","title":"Austrian water cooperative's digital-twin pump scheduler cut energy cost 36% in a 72-hour backtest by timing pumping to solar and cheap power","organization":"Neuhofen an der Krems Water Cooperative, with SBA Research (AI5innovation European Digital Innovation Hub)","sector":"Small cooperative drinking water supply: pumping energy and tank scheduling","geography":"Upper Austria (international)","publishedAt":"2026-11-20","publicationDate":"2026-11-20","eventDate":null,"sourceName":"SBA Research news","sourceLabel":"Research centre project note","sourceUrl":"https://www.sba-research.org/2026/11/20/ai5innovation-test-before-invest-project-with-neuhofen-an-der-krems-water-cooperative/","evidenceClass":"independent-research","outcomeClass":"emerging","topics":["infrastructure","operating-model","governance-procurement"],"finding":"A small water cooperative serving about 10,000 people tested an hourly re-optimised pumping schedule on a digital twin of its network. In a 72-hour backtest, pumping energy cost fell 36% (19% after grid fees) for the same volume of water, and use of its own solar output rose from 74% to 98%. The result is a simulation over three days, not a deployed system, and the savings come from when water is pumped, not from pumping less.","sledRelevance":"Published 20 November. Small US water systems, rural water districts and co-op-served utilities face rising pumping energy costs and time-of-use tariffs; this is a low-cost, publicly funded test-before-invest model that shows both the size of a timing-based saving and how far it is from a live result.","evidence":"One 72-hour backtest against the cooperative's actual operating pattern, reporting cost with and without grid fees and PV utilisation. No live trial, no seasonal or multi-week test, no forecast-error sensitivity and no independent check.","architectureImplications":"EPANET hydraulic model built from GIS and operator data, coupled to an optimiser re-run hourly with demand, price and cloud-cover forecasts; a live version would need SCADA set-point integration and fallback rules.","governanceImplications":"Publicly funded test-before-invest structure (EUR 30,000-40,000, 100% funded) lets a small utility trial before procurement; supply-security constraints must be explicit in the optimiser.","securityPrivacyImplications":"Not discussed; moving from backtest to live control would add an external optimiser writing pump schedules, which needs OT access controls and manual override.","caveats":"Backtest only; three days; savings partly disappear once grid fees are included (36% to 19%); depends on on-site PV and dynamic tariffs that many US small systems do not have.","streamIds":["utility-management"],"roles":{"sales":"Sales framing: this is a small cooperative proving the value of pump timing before buying anything. Use it with rural water districts and small municipal systems facing time-of-use tariffs or adding solar at pump sites. A bounded offer is a desktop pumping-schedule assessment using existing SCADA history and tariffs. The evidence cannot support guaranteed energy savings, any claim that the 36% carries to US tariffs, or claims about water saved, since the note says savings come from timing only.","engineering":"Engineering framing: the method is a hydraulic model plus an hourly optimiser over tank levels, demand, price and PV forecasts. Fit depends on storage headroom, tariff structure and on-site generation. Before any pilot, confirm the GIS and EPANET model calibrate to SCADA pressures and tank levels. Validate over several weeks and seasons, test forecast errors, and keep the optimiser advisory with operator approval before it writes set points, because the source reports only a three-day backtest.","delivery":"Delivery framing: the work is model building, tariff analysis and an advisory scheduling trial, not a control-system replacement. The operational owner is the system's chief operator or general manager. Dependencies are calibrated hydraulic data, tariff and PV data, and SCADA access. Acceptance should rest on measured cost per volume pumped over a full billing period with supply constraints met. Risks are an uncalibrated model, tariff changes, forecast errors and operators overriding schedules they do not trust."},"roleDetails":{"sales":{"customerProblem":"Small water systems pay rising electricity costs for pumping and often fill tanks by habit rather than forecast.","stakeholders":["Water system general manager","Chief operator","Board or district commissioners","Electric utility account manager"],"discoveryQuestions":["What tariff and demand charges apply to your pump stations?","How much storage headroom do your tanks have?","Do you have on-site solar or plans for it?"],"valueHypothesis":"Forecast-driven pump scheduling may lower pumping energy cost where tariffs vary by time and storage allows shifting.","potentialEngagement":"Desktop pumping-schedule assessment using SCADA history and current tariffs, ending in a go or no-go for an advisory trial.","unsupportedClaims":["Guaranteed 36% savings","Water volume savings","Results from a live deployment"]},"engineering":{"fit":"Systems with storage tanks, multiple pumps and time-varying electricity prices or on-site PV.","architectureIntegration":"Hydraulic model from GIS and operator data, hourly optimiser using demand, price and weather forecasts, output as an advisory pump schedule to SCADA operators.","prerequisites":["Calibrated hydraulic model","Tank, pump and tariff data","Demand and PV forecasts"],"constraints":["Fixed or flat tariffs limit benefit","Minimum tank levels and pressure limits","Grid fees reduced savings from 36% to 19%"],"security":"Keep the optimiser advisory, or route any automated set points through OT access controls with manual override.","proofOfValue":["Multi-week live advisory trial","Cost per cubic metre pumped versus baseline","Supply constraints met throughout"]},"delivery":{"work":"Build and calibrate the model, analyse tariffs, run an advisory schedule trial and measure cost per volume.","dependencies":["GIS and SCADA data","Tariff data from the electric provider","Operator time for review"],"ownership":"Water system chief operator or general manager","skillsAdoption":"Operators learn to review and approve forecast-based pumping schedules.","governanceCheckpoints":["Model calibration sign-off","Supply-security constraint review","Trial results review before any automation"],"acceptanceCriteria":["Cost per volume pumped lower than baseline over a billing period","No minimum-level or pressure breaches","Operator acceptance documented"],"risks":["Uncalibrated model","Tariff changes","Forecast errors"]}},"retrievedAt":"2026-11-22T22:16:16-06:00","enrichedAt":"2026-11-22T22:20:54-06:00","enrichmentBasis":"retrieved source","accessibilityWorkforceImplications":"Includes two training sessions; operators would need to trust and supervise an automated schedule.","procurementImplications":"A bounded, grant-funded feasibility step before buying optimisation software; US analogues would be state revolving fund or technical assistance programs.","operatingModelImplications":"Shifts tank filling from fixed operator habit to forecast-driven scheduling within storage and pressure limits.","peerReview":"unknown","sourceVerification":{"openedUrl":"https://www.sba-research.org/2026/11/20/ai5innovation-test-before-invest-project-with-neuhofen-an-der-krems-water-cooperative/","referenceExcerpt":"operation costs EUR 88.70 instead of 137.99 (-36 %, -19 % incl. grid fees) for an identical abstracted volume","promptVersion":"sled-research-v4.0","model":null,"basis":"agent-reported inspection"}}}]}