{"resourceId":"nextplatform-ncsa-garnet-vast-50pb-20261124","versions":[{"version":"external-13e62f121ffb2e56556f2e29d265aa05d1013c29ece168cd95334d4a5026e7dc","resource":{"id":"nextplatform-ncsa-garnet-vast-50pb-20261124","title":"The Next Platform: NCSA's $334M Garnet supercomputer includes a 50 PB raw VAST all-flash system, with about 100 PB usable expected","organization":"National Center for Supercomputing Applications, University of Illinois Urbana-Champaign","sector":"Higher education research computing (public university, philanthropically funded national resource)","geography":"United States (Illinois)","publishedAt":"Tue 24 Nov 2026 18:07 UTC","publicationDate":"2026-11-24","eventDate":null,"sourceName":"The Next Platform","sourceLabel":"Independent trade reporting with operator interview","sourceUrl":"https://www.nextplatform.com/hpc/2026/11/24/ncsa-gets-supercomputing-capacity-with-334-million-schmidt-sciences-grant/5311971","evidenceClass":"independent-reporting","outcomeClass":"emerging","topics":["infrastructure","governance-procurement"],"finding":"NCSA director R. Srikant said part of Garnet's roughly $240M hardware budget buys a VAST all-flash system with 50 PB raw that will probably yield at least 100 PB usable with deduplication and compression, alongside the existing 25 PB DDN Lustre Taiga. Garnet, an HPE system with NVIDIA Grace-Blackwell, is due mid-2027 after a two-bidder competition, with about $94M for five years of operations.","sledRelevance":"First public detail that VAST is the new primary flash tier at a second NSF-scale public university center after TACC Horizon, won inside an HPE-prime competitive bid. Directly relevant to higher-ed research buyers; limited for K-12, local government, HHS and public safety.","evidence":"Read full article. The NCSA Nov 16 announcement (opened) confirms grant, site and mid-2027 date but names no storage, so the VAST detail rests on this interview. Usable capacity assumes about 2:1 reduction; compare NCSA's own ~1.3x Lustre compression result and VAST's 1.5-3.0 typical range for scientific data.","architectureImplications":"VAST flash augments rather than replaces Lustre, so Garnet will run two parallel storage namespaces; data placement and movement policies between VAST and Taiga become part of the design.","governanceImplications":"Philanthropic funding with a 90/10 allocation split and international users (subject to export controls) means storage access policy spans Schmidt Sciences and NCSA governance.","securityPrivacyImplications":"Not addressed; international access under export controls implies tenancy and access-control requirements on shared storage.","caveats":"Single-source interview; 100 PB usable is hedged; storage cost not broken out; no performance targets disclosed.","streamIds":["vast-data"],"roles":{"sales":"Framing: a second flagship public-university reference, priced on effective capacity. Garnet puts VAST at NCSA alongside TACC Horizon, and inside an HPE-led bid, which shows VAST travelling with server primes. For state-university research prospects, use it as evidence of acceptance at leadership scale, but do not repeat the 100 PB usable figure: NCSA itself only said 'probably'. Position a data-reduction assessment on the buyer's data as the step that makes such capacity numbers credible.","engineering":"Framing: 2:1 is an assumption to test. Garnet's usable figure implies about 2:1 reduction on scientific data, above NCSA's own ~1.3x Lustre compression result and near VAST's own median of 1.87. Engineers should size on raw capacity, run reduction scans on representative project and scratch data, and design data placement between the VAST tier and existing Lustre, including how 800 Gb/s InfiniBand clients reach VAST.","delivery":"Framing: two file systems, one user community. Garnet will run VAST beside a 25 PB Lustre system, so delivery work includes namespace layout, migration or tiering policies, quotas by allocation, and user guidance on where data lives. With install in mid-2027 and five funded operating years, plan acceptance tests for capacity, throughput and reduction, and track realised reduction quarterly against the planning assumption."},"roleDetails":{"sales":{"customerProblem":"Research universities need large flash capacity for AI and simulation within fixed grant budgets.","stakeholders":["Research computing center director","Vice chancellor for research","Funding sponsor","Procurement office","Storage engineering lead"],"discoveryQuestions":["What reduction ratio does your capacity plan assume?","Will new flash replace or sit beside your parallel file system?","Is storage bought through a server prime or separately?","Who allocates storage between sponsor and campus users?"],"valueHypothesis":"Interpretation: VAST can supply a large flash tier inside a prime-led bid; effective capacity depends on the buyer's data.","potentialEngagement":"A capacity-planning review with reduction scans on representative datasets before bid submission.","unsupportedClaims":["100 PB usable at Garnet","Performance of the Garnet VAST tier","Cost advantage over Lustre"]},"engineering":{"fit":"Fits large GPU systems adding a flash tier beside an existing parallel file system.","architectureIntegration":"VAST flash namespace alongside DDN Lustre on an InfiniBand-connected HPE Grace-Blackwell system.","prerequisites":["Reduction scans on representative data","Network design for client access to VAST","Data placement policy between tiers"],"constraints":["Install not until mid-2027","Usable capacity estimate hedged","International users subject to export controls"],"security":"Not described; plan tenant separation and access control for sponsor-allocated and campus users.","proofOfValue":["Measure reduction on a sample of scratch and project data","Benchmark throughput from compute nodes to VAST","Test placement and movement between VAST and Lustre"]},"delivery":{"work":"Design and run a two-namespace storage service with placement, quota and migration policies.","dependencies":["Hardware delivery mid-2027","Allocation process from sponsor","User documentation"],"ownership":"NCSA storage engineering and operations.","skillsAdoption":"Staff run both VAST and Lustre; users need clear guidance on which tier to use.","governanceCheckpoints":["Capacity plan review before acceptance","Quarterly realised-reduction review"],"acceptanceCriteria":["Proposed: usable capacity verified against raw at acceptance","Proposed: realised reduction reported quarterly against the 2:1 planning assumption"],"risks":["Usable capacity below plan","User confusion across two file systems","Contention between AI and simulation workloads"]}},"retrievedAt":"2026-11-24T22:18:19-06:00","enrichedAt":"2026-11-24T22:21:44-06:00","enrichmentBasis":"retrieved source","accessibilityWorkforceImplications":"Small storage teams take on a second platform; training and documentation load rises.","procurementImplications":"Effective-capacity figures in bids should be labelled as estimates and tied to tested reduction.","operatingModelImplications":"Sponsor-led allocation means storage capacity is a shared resource between a foundation and a campus.","peerReview":"unknown","sourceVerification":{"openedUrl":"https://www.nextplatform.com/hpc/2026/11/24/ncsa-gets-supercomputing-capacity-with-334-million-schmidt-sciences-grant/5311971","referenceExcerpt":"all-flash storage system from VAST Data that has 50 PB of raw capacity and that will probably have at least 100 PB of usable capacity","promptVersion":"sled-research-v4.0","model":null,"basis":"agent-reported inspection"}}}]}