From the VAST Data edition of November 19, 2026
IO500 SC26: Georgia Tech's VAST-based Nexus enters the Production list at No. 31 of 52 (score 89.20), strong on easy bandwidth, weak on hard-write phases
IO500 Foundation (benchmark list) / Georgia Institute of Technology (submitter) · Higher education and research computing (public university, NSF-funded national resource) · Georgia, United States
- Publisher
- IO500
- Original publication
- SC26 Production list released 2026-11-18 at SC26; Nexus entry rendered on io500.org on 2026-11-19 (not visible in last run)
- Source retrieved
- 2026-11-20
- Event date
- 2026-11-06
What happened
IO500's SC26 Production list, released this week, ranks Georgia Tech's Nexus on VAST No. 31 of 52 with a score of 89.20 (36.76 GiB/s bandwidth, 216.45 kIOP/s metadata) from 38 client nodes, 8.5 PiB and 16 flash data servers. Easy-pattern results are high (193.82 GiB/s write, 174.95 GiB/s read) but hard-pattern results are far lower (2.13 GiB/s write; 8.02 kIOP/s metadata write). It appears to be the first measured, publicly listed storage result for a VAST system at a US public university among sources archived in this stream.
Why it matters
Public research universities now have a published, rule-bound benchmark for a peer VAST deployment rather than only vendor case studies. Nexus is an NSF-funded national resource (archived Oct 2026 as pre-production), so the result matters to university research computing and state research consortia evaluating AI storage. It says nothing about K-12, state/local agencies, HHS or public safety workloads.
Evidence and measured results
Opened the IO500 submission page and the SC26 Production list and read the full rendered tables; StorageReview (Nov 19) independently notes Nexus as a new production entry. The archived Oct 11 supercomputing.news item (scn-gatech-nexus-vast-data-storage-20261011) described an eight-appliance VAST layer; IO500 lists 16 data servers, which uses a different unit and is not reconciled here.
Limitations and uncertainty
Synthetic benchmark; institution-submitted; reproducibility and configuration tabs not opened; scores scale with client count, so rank against 10-node entries is not like-for-like; 4 KiB phase is experimental.
Put this evidence to work
Lighthouse Advisory interpretation, grounded in this source. Enriched 2026-11-19; this does not change the original publication date. Each role follows the same checklist so takeaways compare across sources.
Sales
Role takeaway
- Customer problem
- Universities buying shared AI and HPC storage lack independent, comparable performance data for VAST at peer institutions.
- Stakeholders
- Research computing director
- University CIO
- HPC storage architects
- Procurement office
- Faculty governance committee
- Discovery questions
- Which of your workloads look like IO500 easy versus hard patterns?
- Would a published peer benchmark change your evaluation process?
- How many client nodes would your storage serve at peak?
- Do you require benchmark results in your RFP?
- Value hypothesis
- Interpretation: a public IO500 entry gives buyers a verifiable reference for large sequential I/O on VAST; it does not demonstrate an advantage on small-file or shared-file writes.
- Potential engagement
- A workload-mapping session that compares a university's I/O profile with Nexus's published IO500 phases and defines a pilot test.
- Unsupported claims
- VAST outperforms other listed vendors
- Benchmark results equal researcher productivity gains
- Nexus production reliability or uptime
Pre-sales engineering
Role takeaway
- Fit
- Relevant to research clusters with large sequential and read-heavy AI workloads; weaker evidence for small unaligned or shared-file write workloads.
- Architecture and integration
- VAST 5.4.4 over InfiniBand serving 38 client nodes; 16 flash data servers; 8.5 PiB.
- Prerequisites
- IO500 configuration and reproducibility details for Nexus
- Customer I/O profile by pattern
- Agreed client count for comparison
- Constraints
- Self-submitted benchmark
- Hard-write and metadata-write phases much slower than easy phases
- Client-count differences across list entries
- Security
- Benchmark does not cover access controls, multi-tenancy or encryption; evaluate separately.
- Proof of value
- Run IO500 at comparable client count on the customer pilot
- Test the customer's own small-file and checkpoint workloads
- Compare against the incumbent file system on the same phases
Delivery
Role takeaway
- Work
- Adopt IO500 phases as install and post-upgrade acceptance tests and document file-layout guidance for researchers.
- Dependencies
- Access to IO500 tooling
- Customer agreement on test windows
- Stable software version
- Ownership
- University research computing operations, with storage administrators running benchmarks.
- Skills and adoption
- Staff need to run and interpret IO500 phases and explain small-file write behaviour to research users.
- Governance checkpoints
- Acceptance test before production release
- Re-test after major upgrades
- Annual review of benchmark trends
- Acceptance criteria
- Proposed: IO500 run at agreed client count recorded at install
- Proposed: hard-write phase meets an agreed minimum for target workloads
- Proposed: results published internally with configuration
- Risks
- Over-selling headline bandwidth
- Small-file workloads underperforming expectations
- Comparing unlike client counts
Implementation considerations
Lighthouse Advisory interpretation across the operating dimensions a public-sector buyer must settle before this evidence becomes a design. Each note answers the question under its heading for this specific source.
Architecture and integration
What must connect, and where does the AI sit in the workflow?
NFS-based VAST deployments look strong on large sequential I/O and metadata stat/find, but small unaligned shared-file writes and metadata create/delete are much slower in this run; workloads with many small writers should be tested before assuming headline bandwidth.
Governance
Who approves, reviews and stays accountable for outcomes?
Benchmarks are self-submitted under IO500 rules; procurement teams should treat list rank as one input and ask for the reproducibility questionnaire and configuration.
Security and privacy
What data, permissions and controls need testing?
Not addressed by the benchmark.
Accessibility and workforce
Who is affected, and what skills or accommodations follow?
Interpreting benchmark phases requires storage expertise that smaller institutions may not have in house.
Procurement
What should contracts, pricing and exit terms secure?
RFPs can require IO500 submissions with reproducibility details at a stated client count, and should weight phases matching the institution's workloads rather than overall rank.
Operating model
Which teams own the service once it runs?
Regular benchmarking after upgrades gives research computing a performance baseline it can report to governance bodies.
Publication history
- 2026-11-19VAST Data · Issue 123 resources
Stable resource ID: io500-sc26-gatech-nexus-vast-production-entry-20261119