From the Utility Management edition of November 26, 2026
Oklahoma State wins EPA funding to build sewer digital twins for Stillwater and Edmond and train machine learning on synthetic networks to locate infiltration and inflow
Oklahoma State University with the Cities of Stillwater and Edmond, Oklahoma (municipal sewer utilities) · Municipal wastewater and stormwater: collection-system asset management · Stillwater and Edmond, Oklahoma, United States
- Publisher
- Underground Infrastructure (Underground Construction)
- Original publication
- 2026-11-25
- Source retrieved
- 2026-11-27
- Event date
- 2026-11-25
What happened
A four-year EPA-funded project will build calibrated SWMM digital twins of two Oklahoma cities' sewer systems and use thousands of synthetic 'digital sibling' networks to train machine learning that flags I&I and overflow hotspots, then test predictions with field monitoring and compare fixes on cost. No performance results exist yet.
Why it matters
Reported 25 November 2026. It is a US municipal example of using synthetic data to overcome sparse sewer records, with field validation and cost-benefit comparison built into the design, which mid-size cities facing overflow consent obligations can watch.
Evidence and measured results
Grant announcement with partner cities, method and planned validation; award stated as more than $500,000 over four years. No measured outcomes.
Limitations and uncertainty
Research project at the start; synthetic-to-real transfer is unproven; two cities only.
Put this evidence to work
Lighthouse Advisory interpretation, grounded in this source. Enriched 2026-11-26; this does not change the original publication date. Each role follows the same checklist so takeaways compare across sources.
Sales
Role takeaway
- Customer problem
- Cities know infiltration and inflow drives overflows but cannot locate the sources cheaply.
- Stakeholders
- Wastewater director
- City engineer
- Stormwater manager
- Finance
- Discovery questions
- Do you have a calibrated collection-system model?
- How do you pick I&I investigation areas today?
- Is overflow reduction under a consent order?
- Value hypothesis
- Model-flagged hotspots could focus flow monitoring and inspection on fewer basins.
- Potential engagement
- Data-readiness review and calibrated model scoping for one sewershed.
- Unsupported claims
- Fewer overflows
- Rehabilitation savings
- Model accuracy
Pre-sales engineering
Role takeaway
- Fit
- Sewer utilities with GIS assets, pump station data and some flow monitoring.
- Architecture and integration
- SWMM digital twin feeds synthetic-network generation and ML surrogates; results go to GIS and capital planning.
- Prerequisites
- Collection-system GIS
- Flow and rainfall data
- Overflow history
- Constraints
- Sparse or inaccurate records
- Synthetic-to-real transfer
- Four-year research timeline
- Security
- Agree data-sharing and retention terms for network and utility records.
- Proof of value
- Compare flagged areas with flow-monitoring results
- Hold out storm events for testing
- Benchmark against engineering judgment
Delivery
Role takeaway
- Work
- Build twins, generate synthetic networks, train models, field-test and compare fixes.
- Dependencies
- City data access
- Monitoring site installation
- Researcher continuity
- Ownership
- City wastewater departments with university research team.
- Skills and adoption
- Staff learn to read model hotspots alongside inspection evidence.
- Governance checkpoints
- Data-sharing agreement
- Model calibration review
- Field validation review before capital decisions
- Acceptance criteria
- Proposed: stated share of confirmed I&I sources in flagged areas
- Proposed: calibrated model error within agreed bounds
- Risks
- Poor records
- Overconfidence in research outputs
- Monitoring gaps
Implementation considerations
Lighthouse Advisory interpretation across the operating dimensions a public-sector buyer must settle before this evidence becomes a design. Each note answers the question under its heading for this specific source.
Architecture and integration
What must connect, and where does the AI sit in the workflow?
Physics-based SWMM models generate training data; ML surrogates predict storm response; field flow monitoring validates; outputs feed capital and green-infrastructure decisions.
Governance
Who approves, reviews and stays accountable for outcomes?
Cities should agree how model-flagged hotspots will be verified before rehabilitation money is committed.
Security and privacy
What data, permissions and controls need testing?
Sewer network and utility records are shared with university researchers; data-handling terms are not described.
Accessibility and workforce
Who is affected, and what skills or accommodations follow?
City staff will need to interpret model outputs alongside inspection and smoke-testing results.
Procurement
What should contracts, pricing and exit terms secure?
Federally funded research partnership, not a procurement; a low-cost way for cities to trial methods.
Operating model
Which teams own the service once it runs?
Could shift I&I work from broad inspection campaigns to targeted investigation, if predictions validate.
Publication history
- 2026-11-26Utility Management · Issue 286 resources
Stable resource ID: oklahoma-state-epa-sewer-ii-digital-twin-ml-stillwater-edmond-2026