From the Red Hat edition of November 24, 2026
Red Hat and EDB lab-validate Ansible Automation Platform 2.6 database recovery: under 60 seconds locally, under 5 minutes at a second site
Red Hat (with EDB) · Strategic partner: automation platform resilience · Global (reference architecture)
- Publisher
- Red Hat Blog
- Original publication
- 2026-11-24 (date on the blog post)
- Source retrieved
- 2026-11-25
What happened
Red Hat's 24 Nov post (Steve Fulmer and Anil Kumar) describes a joint Red Hat/EDB reference architecture: Ansible Automation Platform 2.6 containerized enterprise topology on a three-node EDB Postgres AI cluster (one primary, two standbys) with EDB Failover Manager. Reported recovery times are under 60 seconds for database failover within one data center and under 5 minutes for recovery at a second data center. Both are marked lab-validated, with results that vary by environment. The post says asynchronous cross-site replication can lose transactions not yet replicated, and that automated recovery does not mean interrupted workflows resume automatically. Admins must still verify health and review incomplete work.
Why it matters
State and local IT teams increasingly use Ansible for patching, configuration and incident response, so an automation-platform outage can block emergency changes. The post gives agencies concrete RTO targets to test against, along with the limits on data loss and job resumption that continuity-of-operations planning needs.
Evidence and measured results
Blog opened. Topology, the recovery-time table with its lab-validated footnote, the recovery sequence (promote database, start platform, redirect traffic), and the drift-management role of the edb.epas_postgresql collection are described. No customer deployment, test method details or sample sizes are given.
Limitations and uncertainty
Vendor and partner reference architecture. The timings are lab-validated, not field-measured, and depend on workload. Adds a third-party database (EDB Postgres AI) whose licensing and cost are not discussed. The source does not cover AI features.
Put this evidence to work
Lighthouse Advisory interpretation, grounded in this source. Enriched 2026-11-24; this does not change the original publication date. Each role follows the same checklist so takeaways compare across sources.
Sales
Role takeaway
- Customer problem
- An outage of the automation platform can block patching and incident response when agencies need them most.
- Stakeholders
- Agency CIO/infrastructure director
- COOP/continuity planner
- Automation platform owner
- Database administration lead
- Discovery questions
- Does your Ansible Automation Platform have its own DR plan and tested RTO?
- Which critical processes, such as patching or incident response, depend on it?
- Do you have a second site or cloud region for recovery?
- Value hypothesis
- A tested DR design could bring automation-platform recovery close to the lab-validated targets, if the customer's exercises confirm it.
- Potential engagement
- A bounded automation-platform resilience assessment and one DR exercise.
- Unsupported claims
- Guaranteed recovery under 60 seconds or 5 minutes in production
- Zero data loss with asynchronous cross-site replication
- That interrupted jobs resume automatically
- Any SLED customer result
Pre-sales engineering
Role takeaway
- Fit
- Fits AAP 2.6 containerized enterprise deployments where a second site is available.
- Architecture and integration
- AAP 2.6 on a three-node EDB Postgres AI cluster with EDB Failover Manager, a virtual IP, a post-promotion script and a global load balancer.
- Prerequisites
- AAP 2.6 containerized enterprise topology
- EDB Postgres AI subscription
- Second site with network connectivity
- Constraints
- Timings are lab-validated only
- Asynchronous replication can lose recent transactions
- Interrupted jobs need manual review
- Security
- Replicated credential records at the recovery site need the same protection as the primary; test credential access after failover.
- Proof of value
- Measure user-facing recovery time for database and site failure
- Launch a representative job after recovery
- Run a drift audit between sites
Delivery
Role takeaway
- Work
- Build, exercise and document the AAP database DR path, including failback.
- Dependencies
- Second-site infrastructure
- EDB licensing
- Load balancer and DNS changes
- Ownership
- Automation platform team with the DBA team; COOP office owns test cadence.
- Skills and adoption
- Train platform and DBA staff on EDB Failover Manager and the recovery runbook.
- Governance checkpoints
- RTO/RPO approved by business owners
- DR test results reviewed
- Recurring drift audit scheduled
- Acceptance criteria
- Proposed: measured cross-site recovery within the approved RTO
- Proposed: representative job succeeds after failover
- Proposed: failback rehearsed successfully
- Risks
- Data gap from replication lag
- Configuration drift breaking a promoted standby
- Added cost and complexity of a third-party database
Implementation considerations
Lighthouse Advisory interpretation across the operating dimensions a public-sector buyer must settle before this evidence becomes a design. Each note answers the question under its heading for this specific source.
Architecture and integration
What must connect, and where does the AI sit in the workflow?
Active-passive design with a prepared second site whose platform services stay stopped until recovery. Uses a virtual IP for the database endpoint and global load-balancer health checks. Replication mode determines RPO.
Governance
Who approves, reviews and stays accountable for outcomes?
Agencies should set RTO/RPO for the automation platform itself and test them in COOP exercises. Recovery is not complete until representative jobs run.
Security and privacy
What data, permissions and controls need testing?
Credentials and execution history live in the platform database. The recovery site must protect replicated credential records to the same standard as the primary site, and post-recovery tests should confirm that credential access works.
Accessibility and workforce
Who is affected, and what skills or accommodations follow?
Requires DBA skills for EDB failover tooling as well as Ansible platform administration, which may be hard for smaller jurisdictions to staff.
Procurement
What should contracts, pricing and exit terms secure?
Implementing this pattern means an additional EDB subscription and possibly a second-site footprint, so cost and contract vehicle need to be confirmed.
Operating model
Which teams own the service once it runs?
The automation platform becomes tier-1 infrastructure with its own DR runbook, regular failover exercises and drift audits between sites.
Publication history
- 2026-11-24Red Hat · Issue 256 resources
Stable resource ID: red-hat-edb-ansible-automation-platform-disaster-recovery-20261124