Strategic PartnersIssue 725 records
NVIDIA
16 November was a heavy NVIDIA product day, with a caution on how to read the claims. NVIDIA announced a Vera CPU rack-scale HPC platform (192 CPUs, liquid-cooled MGX, Quantum-X800) with vendor OpenFOAM tests, projected WRF gains, OEM availability beginning in early 2027, and DKRZ's early-2028 HLRE-5 selection. An 11 November workshop-accepted arXiv paper, newly relevant against those x86 claims, finds Vera ahead on most tested codes because of memory bandwidth but trailing Intel and AMD on some compute-bound floating-point work. Separately, NVIDIA's MLPerf Training v6.1 technical blog, citing official IDs, says Vera Rubin NVL72 led six of seven benchmarks, including 4.14 versus 8.03 minutes on DeepSeek-V3 at 1,024 GPUs, while a 10,240-GPU GB300 cluster still holds the absolute scale result in this write-up; unverified software reruns are flagged as unofficial. A second newsroom release describes planned IBM and Fermilab quantum-classical codesign work and a CUDA-Q TCBP-JOBS decoder claimed to cut research decoding from 12 weeks to 45 minutes. CNBC, meanwhile, reports an anonymous source saying the board is not considering Jensen Huang's return and has hired Wachtell Lipton to investigate whether his conduct compromised national security or company secrets; no findings are reported.
- Evidence records
- 5
- Cross-source patterns
- 1
- Evidence classes
- 3 vendor claim1 academic research1 independent reporting
- Outcomes
- 2 emerging2 mixed1 cautionary
- Source freshness
- 5 new this fortnight
- Research completed
- 2026-11-17
Choose a role to see its takeaway beside every record in the ledger.
Patterns across the evidence
Synthesis · Lighthouse Advisory interpretation
Vera CPU performance should be judged by workload class: vendor x86 speedups sit beside an independent finding that Vera can trail on compute-bound floating-point codes
NVIDIA's 16 November release reports 1.9x OpenFOAM performance and 2.4x performance per watt versus unspecified x86 systems, plus projected 1.6x/2x WRF figures, for a rack-scale Vera CPU product that will not be sold by OEMs until early 2027. The 11 November PMBS26 paper posted on arXiv, which compares single-socket Vera with Turin, Granite Rapids, and Grace, finds Vera best in most codes tested because of memory bandwidth, and also finds that modest floating-point performance trails Intel and AMD on some compute-bound work. Together they support a narrower operating conclusion than the press release headline: memory-bound scientific codes are the plausible fit; compute-bound floating-point codes need their own measurements, and neither source validates the other's exact tests.
Operating questionBefore treating NVIDIA's Vera-versus-x86 figures as a planning baseline, have you classified your CPU codes as memory-bound or compute-bound and identified which results are vendor tests, projections, or single-socket academic measurements?
Supporting evidenceNVIDIA Expands Vera CPU Platform to Accelerate Scientific DiscoveryUniversity of Bristol (authors Joseph Moore, Thomas Green, Simon McIntosh-Smith, as listed on arXiv)
Evidence ledger
Full record · every source keeps its link and limitations
NVIDIA Expands Vera CPU Platform to Accelerate Scientific Discovery
On 16 November 2026 NVIDIA announced a Vera CPU rack-scale HPC platform: 192 Vera CPUs, about 300TB of memory and 1 petabyte of storage in a liquid-cooled MGX design, with Quantum-X800 InfiniBand, reusing NVL72 rack components. Each CPU has 88 custom Olympus cores, 176 threads, and SOCAMM2 LPDDR5X memory rated up to 1.2TB/s; the rack is described as delivering more than 200TB/s of aggregate peak memory bandwidth. In NVIDIA's tests, Vera delivered 1.9x the performance and 2.4x the performance per watt of unspecified x86 systems on OpenFOAM's motorBike Large airflow simulation. NVIDIA also reports projected 1.6x performance and 2x energy-efficiency gains versus x86 on the open-source Weather Research and Forecasting model. The release says DKRZ has selected Vera CPUs for its Bull-built HLRE-5 climate supercomputer, alongside GB200 Grace Blackwell systems and Quantum-2 InfiniBand, with that system expected in early 2028. HPC SDK 26.11 is available now; a next-generation Fortran compiler is in public beta. Vera CPU racks are expected from Dell, HPE, Lenovo and Supermicro beginning in early 2027.
Why it matters, evidence and limitations
- Why it matters
- This is a vendor HPC platform announcement, not a U.S. SLED deployment. Transferable points are the early-2027 OEM availability window, liquid-cooling and NVL72-component reuse, and a named European climate-center selection (DKRZ HLRE-5) that is expected only in early 2028. Public research computing and state climatology programs that still run CPU-heavy WRF or OpenFOAM work may eventually see a Vera option, but no U.S. institutional award, price, or power figure is given here. Do not treat the x86 speedup claims as independently confirmed.
- Evidence and measured results
- The opened NVIDIA Newsroom page is dated November 16, 2026 and states the rack specification (192 Vera CPUs, approximately 300TB memory, 1 petabyte storage, liquid-cooled MGX, Quantum-X800, NVL72 component reuse), the per-CPU 88 Olympus cores / 176 threads / SOCAMM2 LPDDR5X up to 1.2TB/s, and more than 200TB/s of aggregate peak memory bandwidth. It attributes OpenFOAM motorBike Large results to NVIDIA's tests (1.9x performance and 2.4x performance per watt versus x86) and describes WRF figures as projected (1.6x performance and 2x energy efficiency versus x86). It names DKRZ's HLRE-5 selection with GB200 and Quantum-2, built by Bull, expected to be available in early 2028, and says OEM racks begin in early 2027. HPC SDK 26.11 is available now; the Fortran compiler is a public beta. A forward-looking-statements section warns that products remain in various stages and timing can change.
- Limitations and uncertainty
- All performance figures are NVIDIA's, versus an unnamed x86 baseline and configuration. WRF results are explicitly projected, not the same as the OpenFOAM tests. Energy and time-to-solution for HLRE-5 are qualitative (lower energy consumption than on the current system) with no measured baseline. Early-2027 and early-2028 dates can slip. This page does not publish price, TDP, or facility power requirements.
NVIDIA Vera: A Microarchitecture-Level Comparison with Grace, Turin, and Granite Rapids
An 11 November 2026 arXiv posting, accepted at the PMBS26 workshop at SC26, compares NVIDIA's Vera data-center CPU (custom Olympus core) with AMD Turin and Intel Granite Rapids, using NVIDIA Grace as a baseline. The authors report results from microbenchmarks, NAS kernels and miniapps, and single-socket scientific codes. They find Vera achieves the best performance of the architectures evaluated in most codes tested, and attribute that mainly to high memory bandwidth, Spatial Multithreading, and a low-latency memory subsystem. They also find that Vera's comparatively modest floating-point performance trails Intel and AMD in a small number of compute-bound workloads, which they say reflects NVIDIA's GPU focus for such work. The posting notes it corrects a typo in Sec. IV-B relative to the proceedings version. This paper is newly relevant on 16 November because NVIDIA's same-day Vera rack announcement cites x86 speedups that this independent comparison can bound.
Why it matters, evidence and limitations
- Why it matters
- The paper is an academic CPU comparison, not a government or education deployment. It is useful to SLED and research-computing buyers as an independent check on NVIDIA's 16 November vendor claims: Vera may lead on memory-bound scientific codes and may trail on compute-bound floating-point work. It does not evaluate the 192-CPU rack, Quantum-X800 fabric, or WRF/OpenFOAM figures in the NVIDIA release, and it is single-socket.
- Evidence and measured results
- The opened arXiv abstract page for 2611.15926 lists submission on 11 November 2026, authors Joseph Moore, Thomas Green and Simon McIntosh-Smith, and acceptance at PMBS26 (SC26 Workshops). The abstract states the comparison (Vera versus Turin and Granite Rapids, Grace as baseline), the method ladder (microbenchmarks, NAS kernels and miniapps, single-socket scientific codes), the majority-case win attributed to memory bandwidth, Spatial Multithreading and low-latency memory, and the limitation that modest floating-point performance trails Intel and AMD in a small number of compute-bound workloads. The page does not include the figures, tables, or per-code scores; those are in the PDF, which was not the inspected URL.
- Limitations and uncertainty
- Inspection was limited to the arXiv abstract page, not the full PDF methods, figures, or tables, so per-code effect sizes and test configurations are not verified here. Results are single-socket and may not represent a 192-CPU InfiniBand rack. 'Most codes tested' is not quantified on the abstract page. This URL is a preprint posting that notes a typo correction versus the proceedings version.
NVIDIA Vera Rubin NVL72 Achieves up to 2x Blackwell Ultra Performance in MLPerf Training v6.1
NVIDIA's 16 November 2026 technical blog reports Vera Rubin NVL72's first MLPerf Training v6.1 results. It says the platform posted the fastest time to train on six of seven benchmarks, at up to 2x performance per GPU versus a GB300 NVL72 baseline. On DeepSeek-V3 671B, Vera Rubin NVL72 trained in 4.14 minutes at 1,024 GPUs (16 racks) versus 8.03 minutes for GB300 NVL72 at the same scale, with above 97% scaling efficiency from 256 to 1,024 GPUs. The seventh benchmark's absolute fastest time is attributed to a 10,240-GPU GB300 NVL72 cluster at 1.38 minutes; Azure's 2,560-node, 10,240-GPU GB200 NVL72 submission is said to have tied that NVIDIA run for the round's largest clusters. On the new Qwen 3.5 397B GRPO post-training benchmark, Vera Rubin led at 10.44 minutes at 1,024 GPUs (6.1-0117) versus 13.78 minutes for GB300 (6.1-0031), and also submitted a vLLM backend result at 10.94 minutes (6.1-0118). Table 1 lists 1.4x to 1.6x per-GPU gains on the remaining workloads at 64, 72 or 128 GPUs. The post separately reports unverified November 2026 reruns with a newer software stack that further reduced times on Llama 3.1 8B, gpt-oss 20B and DLRMv4. It says 80 percent of closed-division submissions ran on NVIDIA platforms across 20 partner organizations, and that Vera Rubin NVL72 systems are generally available through cloud infrastructure partners.
Why it matters, evidence and limitations
- Why it matters
- This is an industry training-benchmark post, not a government or university case study. It matters to SLED buyers as vendor-reported, ID-cited MLPerf evidence that Vera Rubin NVL72 is appearing in official v6.1 results and is claimed to be generally available in clouds, while the largest official scale record in this write-up remains a 10,240-GPU GB300 cluster (tied in size by an Azure GB200 submission). Unverified reruns are not official MLPerf results and should not be used in procurement scoring. No public-sector customer result is given.
- Evidence and measured results
- The opened NVIDIA Technical Blog page is dated Nov 16, 2026. It cites MLPerf Training v6.1 closed-division entries retrieved from www.mlcommons.org on Nov 16, 2026, including IDs 6.1-0116, 6.1-0030, 6.1-0135, 6.1-0020, 6.1-0049, 6.1-0123, 6.1-0138, 6.1-0073, 6.1-0124, 6.1-0129 and 6.1-0038 for Table 1, plus 6.1-0117, 6.1-0031 and 6.1-0118 for Qwen results, and Firmus GB300 8-GPU results 6.1-0091 (52.90 minutes on GPT-OSS 20B) and 6.1-0094 (52.40 minutes on Llama 3.1 8B). It states the 4.14 versus 8.03 minute DeepSeek-V3 comparison at 1,024 GPUs, 1.38 minutes at 10,240 GB300 GPUs, above 97% scaling efficiency, Table 1's 1.4x to 2x per-GPU ratios, 80 percent of closed-division submissions on NVIDIA platforms across 20 partners, and general cloud availability. A labeled Nov 2026 Unverified Results table is distinguished from official MLPerf IDs. The page includes an AI-generated summary disclaimer.
- Limitations and uncertainty
- This is NVIDIA's write-up of MLPerf entries, not the MLCommons results explorer. Comparisons are largely to NVIDIA's own GB300 NVL72, not to AMD or Google systems also mentioned in the broader v6.1 field. Up to 2x is the DeepSeek-V3 1,024-GPU case; several other Table 1 ratios are 1.4x to 1.6x. Unverified reruns are not official. The 80 percent closed-division figure is NVIDIA's count. Availability is asserted without a full partner list on the inspected page, aside from later mentions of Azure and Firmus submissions.
NVIDIA Announces Collaboration With IBM and Fermi National Accelerator Laboratory on a Quantum-Classical Codesign Platform and a CUDA-Q Decoding Algorithm
On 16 November 2026 NVIDIA announced planned collaborations with IBM and DOE's Fermi National Accelerator Laboratory on a modular quantum-classical codesign platform, plus a new CUDA-Q decoding algorithm called TCBP-JOBS. NVIDIA and IBM plan to colocate DGX B200 systems with IBM quantum computers, including IBM Quantum Nighthawk, to support work on error-correction codes, decoders, and high-energy and nuclear physics applications, and on scaling classical systems with multiple linked quantum processors. TCBP-JOBS is said to be available in CUDA-Q QEC 0.9.0 and to accelerate the computationally intensive parts of quantum error-correction research by up to 13,000x, which the release also describes as cutting design-research computation from 12 weeks to 45 minutes versus existing leading algorithms, while delivering high accuracy. NVIDIA says it is expanding Slurm so quantum processors can be scheduled in supercomputing workflows, with IBM contributing integration through its Quantum Resource Management Interface. A related NVIDIA blog, opened separately, dates the Slurm 26.11 expansion as coming later this month. The release includes a forward-looking disclaimer that products remain in various stages.
Why it matters, evidence and limitations
- Why it matters
- This is a DOE national-laboratory and vendor research collaboration, not a state or local operational deployment. It is relevant to university and federal research computing teams that already run Slurm and may later add quantum processors, and to anyone evaluating CUDA-Q QEC 0.9.0. The 13,000x figure is a vendor research-workload claim with no independent confirmation on this page. Do not recast it as a general SLED quantum-computing program.
- Evidence and measured results
- The opened NVIDIA Newsroom page is dated November 16, 2026. It states plans to colocate DGX B200 systems with IBM quantum computers including Nighthawk; a jointly developed IBM, Fermilab and NVIDIA codesign platform focused on error correction and HENP applications; availability of TCBP-JOBS in CUDA-Q QEC 0.9.0; the up to 13,000x and 12 weeks to just 45 minutes research-time claims versus existing leading algorithms; and Slurm expansion with IBM QRMI integration. Quoted speakers include NVIDIA's Krysta Svore and IBM's Jerry Chow. Forward-looking-statement language says features will be offered on a when-and-if-available basis and that development, release and timing remain at NVIDIA's discretion.
- Limitations and uncertainty
- The 13,000x and 12-weeks-to-45-minutes claims are NVIDIA's, limited to computationally intensive parts of error-correction research versus unnamed existing leading algorithms, with high accuracy undefined on this page. Colocation and the codesign platform are described as plans. Slurm 26.11 timing is not fully specified on this newsroom page. No independent benchmark is included.
Nvidia board is not considering bringing Jensen Huang back as CEO, source tells CNBC
CNBC reported on 16 November 2026, updated the same afternoon, that a person familiar with the matter said Nvidia's board is not considering bringing Jensen Huang back as CEO and is focused on an investigation into Huang, with no discussions to bring him back. CNBC says Nvidia has hired law firm Wachtell Lipton to lead a probe into Huang's conduct and whether it compromised national security or company secrets. The article recaps Huang's resignation the previous week after he admitted an affair and after reports involving Alice Huang and alleged contact with Chinese intelligence, and affairs with Nvidia employees. It says the Financial Times reported over the weekend that Huang had discussed coming back with allies, and that Altimeter Capital's Brad Gerstner told CNBC on Monday that Huang had not discussed a comeback with him. A representative for Huang declined to comment on speculation on Sunday. CNBC also reports an online petition with 180,000 signatures and public support from named technology figures, that President Trump said on Monday he is open to Huang returning and, asked about national security concerns, said 'It was not put at risk, and our country is now stronger than ever before,' and that on Friday a representative for Nvidia's board said it was selecting a search firm for the CEO role.
Why it matters, evidence and limitations
- Why it matters
- This is corporate governance reporting, not a product or deployment study. SLED customers with NVIDIA-dependent roadmaps may be asked about leadership continuity and the national-security investigation. The article does not show any change to product shipments, support, or export rules, and it does not find that secrets were compromised. Relevance is vendor-risk awareness, not a technical change.
- Evidence and measured results
- The opened CNBC page carries a published time of Mon, Nov 16 2026 12:38 PM EST and an update of 2:46 PM EST. It attributes the board's position to a person familiar with the matter who spoke on condition of anonymity in order to discuss internal matters. It states the Wachtell Lipton mandate in CNBC's own voice. Other attributed items include Gerstner's on-the-record remark, a Sunday decline-to-comment from a Huang representative, Friday's board comment about selecting a search firm, the Financial Times weekend report, the petition signature count and named supporters, and Trump's quoted Monday remarks. No investigation findings are reported.
- Limitations and uncertainty
- The central board-position claim rests on a single anonymous source. The investigation is ongoing; no findings of compromise are presented. Petition support and Trump's comments do not change the reported board process. Prior week's resignation and related allegations are recap, not newly adjudicated facts.
How to read this edition
Source findings, measured results and limitations come from the cited publications. Patterns, operating questions, role takeaways and implementation considerations are Lighthouse Advisory interpretation, stated as questions to validate locally rather than guaranteed outcomes. Vendor and operator claims are labeled as claims. Full research method.
- Vendor claim
- A supplier-provided assertion that has not been upgraded to independent evidence.
- Academic research
- Research produced through an academic institution or peer-reviewed venue.
- Independent reporting
- Independent reporting with attributable sources but without a formal evaluation design.